Turbines of the Ural manufacturers are high valued for their high reliability and durability: the first AT-12 steam turbine with 12 MW capacity was assembled and tested in May 1941, though it was first UTW turbine it had worked for 48 years. The gas turbines of UTW manufacturing got over magnitude 9 earthquakes that took place in Gazli