AAC brick making machine price, AAC block, construction equipment
Introduction of AAC Brick Production Line:
1. Storing and supplying of raw materials of AAC blocks:
All raw materials are carried into factory by trucks, such as Fly ash, sand or lime are gathered in specified raw materials field waiting for use. Sacks of cement and bulk cements stored in cement warehouse. Chemicals and aluminium powder are separately keeped in chemical warehouse and aluminium ware hours. When used, these raw materials are carried into workshop respectively.
2. Processing of raw materials:
Fly ash, sand or limestone is sent into ball mills by vibration feeders and belt conveyor. Then fine powders of flyash, sand or lime are pumped into slurry tank.
Quick lime is sent by vibrating feeder and belt conveyor into jaw crushers to smash. Smashed lime is sent into lime silo by bucket elevator and then is transported into ball mills by screw conveyor. Fined materials are sent into proportion bin by screw conveyor and bucket elevator.
3. Aerated block ingredients, stiring and casting
Flyash (or sand or stone powder )and waste slurrry are measured in measuring tank. After the measuring and mould in their place, slurry stirring begins. Slurry temperature should reach about 40° C.